Esso Australia, a subsidiary of ExxonMobil Australia, is planning on undertaking a program of work across some of its offshore assets, including those owned jointly by the Gippsland Basin Joint Venture, in 2018 and 2019. This program forms part of Esso’s ongoing investment in exploring domestic gas development opportunities to ensure that we can continue to meet Australia’s energy needs.

Article

Offshore projects

VIC/P70 drilling program

Esso is undertaking an exploration drilling program in the VIC/P70 block, approximately 90km off the East Gippsland Victorian coast. The program will involve drilling two exploration wells, known as Baldfish and Hairtail. 

All regulatory requirements are in place with the Environmental Plan accepted by NOPSEMA on 4 July 2018. A summary is available on the NOPSEMA  website and on the ExxonMobil Australia website.

The drilling program is expected to start in the second half of 2018 and continue for approximately 60 days, using the Ocean Monarch mobile offshore drilling unit (MODU).

VIC/L20 Blackback

Esso is undertaking a project to work on the Blackback wells also using the Ocean Monarch MODU. The program is expected to start in the second half of 2018 and continue for approximately 60 days. (Well  coordinates: Latitude 38° 32’ south, Longitude 148° 33’ east).

VIC/L1 development

Esso is examining options to develop a gas field in block VIC/L1 known as West Barracouta, approximately 6km south west of the existing Barracouta platform. The project is likely to involve  the drilling of two subsea wells within one petroleum safety zone, which will be tied back to our existing Barracouta infrastructure in Bass Strait.

To support the project’s development, Esso has conducted environmental and seabed surveys and geotechnical surveys are planned to be completed the first half of 2019 (previously planned for 2018), subject to regulatory approval. The results of these surveys will be used to assess the location of the well sites and flowline and umbilical routes.

VIC/L05 Cobia Pipeline project

The Cobia Pipeline project will undertake maintenance and repair works on the Cobia pipeline, which runs from the Cobia platform to the Halibut platform in Bass Strait. The offshore work for this project is planned to be carried out by the Seven Eagle, a dive support vessel, in December 2018 and will take approximately two weeks.

VIC/L05 Mackerel and other platform based activities

Esso is also considering work on the Mackerel wells with the program expected to begin in November 2018 and continue for approximately 10 months (Platform coordinates: Latitude 38° 27’ south, 148° 18’ east), with various platform based activities scheduled throughout 2019 to 2022.

VIC/L25 and VIC/L9 Kipper 1B and Pilchard

Esso and its Kipper Unit Joint Venture partners  are planning to drill a number of additional wells at Kipper (Well coordinates: Latitude 38°  11’ south, Longitude 148° 36’ east).  These wells were part of the original Kipper plan and are referred to as Stage 1B. The current schedule is for the Kipper 1B wells to be drilled  in 2020.

Esso Australia, a subsidiary of ExxonMobil Australia, is undertaking a program of work across some of its offshore assets, including those owned jointly by the Gippsland Basin Joint Venture and the Kipper Unit Joint Venture, in 2018 and 2019. 

You can also send us an email at consultation@exxonmobil.com or call +61 03 9261 0260 if you would like to discuss this project.
Having completed the largest single investment into Australia’s domestic gas market, the $5.5 billion Kipper Tuna Turrum Project, as well as the $400 million replacement pipeline project, Esso is pleased to continue investing in its Gippsland operations, bringing new domestic gas supplies to market and creating jobs.

Related content

Bass Strait

In 1965 an Esso/BHP Billiton joint venture drilled Australia's first offshore well and discovered the Barracouta gas field in Bass Strait.

Upstream Article

Longford Plants

Longford, with its three gas plants and one crude oil stabilisation plant, is one of the most important industrial facilities in Australia.

Upstream Article

Gorgon project

The project is developing the Gorgon and Jansz-Io fields, located between 130 and 200 kilometres off the northwestern coast of Western Australia.

Upstream Article

Kipper Tuna Turrum (KTT)

The Kipper Tuna Turrum Project is the largest domestic gas development on the eastern seaboard.

Upstream Article

Natural gas - the cleaner energy option

Natural gas will play an increasingly important role in meeting the world's growing demand for energy.

Upstream Article

Long Island Point

Opened in 1970, the Long Island Point plant, situated near Hastings, 75 kilometres south-east of Melbourne, plays a vital role in the Bass Strait production line.